QuarrowKitchens & Baths
A finished kitchen with sage handleless cabinets, a marble backsplash, a walnut breakfast bar with a marble top set for dinner, and brass and chrome pendant lights

Kitchens, bathrooms and primary baths in Salt Lake City

Rooms built by one team, priced once and kept to it.

We design it with you, our own crew builds it, and one project manager answers your calls from demo day to the last bead of caulk.

A typical Quarrow kitchen

Kitchens from
$28,000
Weeks on site
3–4
Guarantee
10 years

4.9 from 318 reviews · 640 rooms since 2011

11 carpenters and tile setters on the payroll, and not one of them rushes a tile

Most companies sell the kitchen and hand the install to whoever is free. We employ our own carpenters and tile setters, and our plumbers and electricians are in-house and licensed. The people who measure your room are the people who finish it.

Rooms built since 2011
640
Jobs finished on the planned week
94%
Workmanship guarantee
10 yrs
Meet the team
A tile setter’s gloved hand spreading thinset with a trowel between large gray porcelain floor tiles held level with clips

From first visit to handover

Five stages, one project manager, and a text every Friday so you never have to chase.

  1. Week one

    Design visit

    A designer comes to you, measures up, checks the walls, the drain lines and the wiring, and listens. Free, about ninety minutes.

  2. Within ten days

    Plan and fixed price

    A 3D plan, samples in your hands at the showroom and one written price. We revise it until it is right; no deposit until you are sure.

  3. 5 – 11 weeks

    Ordering and prep

    Cabinets, stone and fixtures are ordered for one delivery date. Your project manager books every trade and sends you the week-by-week plan.

  4. 2 – 4 weeks

    On site

    Demolition, rough-in, drywall, installation, tile, finish work. Drop cloths down every morning, a clean site every evening, a text update every Friday.

  5. Final day

    Handover

    We walk the room with you, fix anything on the punch list, and hand over the warranties. The last 10% is only due once you are happy.

What will it cost, and when can you start?

Pick the room, the size, the finish and any extras. You get an installed price range, weeks on site, the stage payments and the earliest month we can start.

Which room?
How big is it?
Finish level

What each level includes

Changing the layout?
Anything extra?

Essential, Signature or Custom?

The same crew and the same guarantee at every level. What changes is the doors, the countertops, the tile and how long the materials take to arrive.

What is included at each finish level, and the installed price from
Essential Stock cabinets, laminate or solid-surface tops, porcelain tile. Honest, hard-wearing and quick to install. Chosen most Signature Inset or painted Shaker doors, quartz tops, large-format tile and brushed brass. The one most people choose. Custom Cabinetry built to measure in our partner woodshop, solid oak or walnut, natural stone and hand-cut tile.
Kitchen from $28,000$50,400
Bathroom from $16,000$28,800
Primary bath from $12,000$21,600
Doors and cabinets Stock cabinets, slab doors in 12 colorsCustom-built in oak, walnut or poplar
Countertops Laminate or solid surfaceNatural stone or 3 cm quartzite
Tile Porcelain from our core rangeHand-set patterns and feature walls
Faucets and fixtures Chrome or matte blackAny finish, including unlacquered brass
Lighting Recessed lights and one lighted mirrorLighting plan by your designer
Order to site 5 weeks11 weeks
Price it at Essential Price it at Custom

Project story · Sugar House, Salt Lake City

A dark galley and a dining room nobody used, made into one room

Estimator said
$65,100 – $77,600
Final bill
$72,800
Weeks on site
6 of 6 planned

What changed

  • Wall between galley and dining room out, one steel beam in
  • Sink moved under the new window, cooktop onto the island
  • Marble-effect quartz waterfall island seating four
  • Chevron oak floor laid through both rooms

“We had three quotes. Quarrow’s was not the cheapest, but it was the only one that was one number, and it stayed one number. Six weeks, exactly as the plan said, and Dan called every Friday even when there was nothing to report.”

R. & J. M., homeowners
Read the whole project, with before and after

Ideas worth stealing, with the budget they need

Three rooms we would happily build again, and what they cost to get right.

All design ideas

Planning, costs and living with the work

The questions every design visit starts with.

Planning

How far ahead do we need to book?
Most jobs start eight to ten weeks after the design visit: two weeks to agree the plan, then the lead time on your cabinets and stone. Custom cabinetry is closer to thirteen weeks. The estimator shows the earliest start month for the finish you pick.
Do we need a permit?
A like-for-like kitchen or bathroom usually needs only the plumbing and electrical permits, which we pull. Taking out a wall, adding a window or moving a drain stack needs a building permit and inspections, and we handle the application and the inspections. Historic-district homes and condos may need more; we check at the design visit.
Can we supply our own appliances or tiles?
Yes. We install customer-supplied appliances, faucets and tile, and we check the specification before you buy. Our workmanship guarantee still covers the installation; the item itself is covered by its manufacturer.

Costs

Is the estimator price the price we pay?
It is a range built from our real price list. After the survey you get one fixed written price. In the last twelve months, 9 in 10 fixed prices landed inside the estimator’s range.
What is included in the price?
Design, demolition and debris removal, cabinets or fixtures, countertops, plumbing, electrical, drywall, tile, flooring, painting the room and finish work. Appliances are priced separately unless you ask us to supply them.
How do payments work?
A 20% deposit holds your start date. 40% is due when materials arrive and work starts, 30% when tile and countertops are in, and the last 10% only after the punch list is cleared.

During the work

Can we stay in the house?
Almost everyone does. For kitchens we set up a temporary sink and counter, and for bathrooms we keep a toilet working every night unless you have a second one.
Who will be in our house?
Our own carpenters and tile setters, and our in-house plumbers and electricians. Drywall finishers and stone templaters are long-standing subcontractors your project manager books and supervises.
How do we know what is happening?
Your project manager sends a week-by-week plan before we start and a text update every Friday. You have their cell number for everything else.

Every question on one page

Start with a free design visit

A designer comes to you, measures up and listens. Ten days later you have a 3D plan and one fixed price, and no deposit until you are sure.