Prices
Our price list, published
These are the prices our designers quote from. Every one is installed: design, demolition, plumbing, electrical, drywall, tile, flooring and finish work.
| Essential Stock cabinets, laminate or solid-surface tops, porcelain tile. Honest, hard-wearing and quick to install. | Chosen most Signature Inset or painted Shaker doors, quartz tops, large-format tile and brushed brass. The one most people choose. | Custom Cabinetry built to measure in our partner woodshop, solid oak or walnut, natural stone and hand-cut tile. | |
|---|---|---|---|
| Kitchen from | $28,000 | $37,800 | $50,400 |
| Bathroom from | $16,000 | $21,600 | $28,800 |
| Primary bath from | $12,000 | $16,200 | $21,600 |
| Doors and cabinets | Stock cabinets, slab doors in 12 colors | Painted Shaker or inset, any color | Custom-built in oak, walnut or poplar |
| Countertops | Laminate or solid surface | 2 cm quartz, templated in place | Natural stone or 3 cm quartzite |
| Tile | Porcelain from our core range | Large-format or zellige-style, mitered edges | Hand-set patterns and feature walls |
| Faucets and fixtures | Chrome or matte black | Brushed brass, nickel or gunmetal | Any finish, including unlacquered brass |
| Lighting | Recessed lights and one lighted mirror | Toe-kick and shelf LEDs on dimmers | Lighting plan by your designer |
| Order to site | 5 weeks | 7 weeks | 11 weeks |
| Price it at Essential | Price it at Signature | Price it at Custom |
Every room and size, at every level
Layout changes and extras are added on top. The estimator does the sums for you.
| Room and size | Essential | Signature | Custom | On site from |
|---|---|---|---|---|
| Compact kitchenup to 100 sq ft, a galley or small L | $28,000 | $37,800 | $50,400 | 3 weeks |
| Medium kitchen100 – 180 sq ft, room for a table | $38,000 | $51,300 | $68,400 | 3½ weeks |
| Large kitchen180 sq ft and over, space for an island | $52,000 | $70,200 | $93,600 | 4 weeks |
| Compact bathroomup to 45 sq ft, tub or shower | $16,000 | $21,600 | $28,800 | 2 weeks |
| Medium bathroom45 – 75 sq ft, tub and separate shower | $22,000 | $29,700 | $39,600 | 2½ weeks |
| Large bathroom75 sq ft and over, room for a freestanding tub | $29,000 | $39,200 | $52,200 | 3 weeks |
| Compact primary bathup to 30 sq ft, shower, sink, toilet | $12,000 | $16,200 | $21,600 | 1½ weeks |
| Medium primary bath30 – 45 sq ft, a proper walk-in | $15,000 | $20,300 | $27,000 | 2 weeks |
| Large primary bath45 sq ft and over, double vanity | $19,000 | $25,700 | $34,200 | 2½ weeks |
Layout changes and extras
- Kitchen: move the plumbingSink or appliances to a new wall+$2,500
- Kitchen: open up a wallOpen into the dining room: beam, permits and inspections, patching+$12,000
- Bathroom: move the plumbingSwap the tub and shower, move the toilet+$2,200
- Bathroom: open up a wallJoin a separate toilet room and bathroom into one room+$7,000
- Primary bath: move the plumbingNew drain run, an upflush toilet where needed+$1,800
- Primary bath: take space from the bedroomNew framed wall and door, a new room where there was none+$6,500
- Island or peninsulaKitchen+$6,000
- Quartz countertop upgradeKitchen+$4,500
- Instant hot water faucetKitchen+$1,200
- Walk-in shower with glass panelBathroom, Primary bathfrom +$3,500
- Freestanding tubBathroom+$3,500
- Heated floorsKitchen, Bathroom, Primary bathfrom +$1,100
- Heated towel warmerBathroom, Primary bathfrom +$800
- Lighting packageKitchen, Bathroom, Primary bathfrom +$950
How you pay
Nothing until you have a plan and a fixed price you are happy with. Then four stages, each tied to work you can see.
- Deposit, to hold your start date
- When materials arrive and work starts
- When tile and countertops are in
- At handover, after the punch list
Deposits are held in a protected account until work starts. We take bank transfer, check and card; no cash on site.
Put your own room through it
Pick the room, size, finish and extras. You get the range, the weeks on site, each stage payment and the earliest start month.