QuarrowKitchens & Baths
A white freestanding tub on a raised platform tiled in blue-gray stone, with an LED-lit mirror and a navy floating vanity behind
A freestanding white tub beside a floor-mounted chrome tub filler against a wall of textured wave-pattern tile
A bright bathroom with two wall-mounted sinks, green-tinted mirrors, a glass shower enclosure and a tub behind a sculpted screen

2 – 3 weeks on site

Bathrooms

From $16,000 installed, Essential finish

Hall and family bathrooms taken back to the studs and rebuilt: waterproofed, tiled and finished, with a toilet working every night.

  • Demolition to bare studs and subfloor, joists checked
  • Waterproofing behind every tile that can get wet
  • Tub, sink, toilet and fixtures installed and tested
  • Wall and floor tile, exhaust fan, lighting
  • A toilet back in use at the end of every day

4.9 from 318 reviews · 10-year workmanship guarantee

A bathroom is small, but it is the room where a shortcut costs you most. Water finds every gap. So every bathroom we build is taken back to bare studs and joists, and every surface that can get wet is waterproofed before a tile goes on.

A compact bathroom at Essential starts at $16,000 installed, a medium room with a tub and separate shower is around $22,000, and a large room with a freestanding tub from $29,000. Moving the toilet or swapping the tub and shower adds $2,200.

Two to three weeks, with a working toilet

Demolition and rough-in take the first week, tile the second. If yours is the only toilet in the house, we reconnect it at the end of every working day.

Tile is where you see the care

Our tile setters lay out every wall before they set: cuts equal at both ends, no sliver beside the door, grout lines that meet the tub edge. It takes longer, and it is the difference you notice every morning.

Good for

  • Swapping a tub for a walk-in shower, or the reverse
  • Bathrooms with a leak, a soft floor or tired fixtures
  • A freestanding tub in a room with the space for it
“Our primary bath used to be a closet with a shower in it. It is now the best room upstairs, and it took eight working days.”
D. & K. L., Holladay · Primary bath, Signature

Recent jobs like this

Other rooms we build