3 – 4 weeks on site
Kitchens
From $28,000 installed, Essential finish
A new kitchen in the room you have: designed with you, installed by our own crew, finished down to the last caulk line.
- Free design visit, 3D plan and one fixed written price
- Demolition, debris removal and a temporary sink while you wait
- Cabinets, countertops, sink and faucet, installed and sealed
- Plumbing, electrical, drywall, tile and flooring
- Painting the room and finish work around it
4.9 from 318 reviews · 10-year workmanship guarantee
Most kitchens we remodel keep their layout. The sink stays under the window, the range stays on its wall, and the money goes into the things you touch every day: doors that close quietly, drawers that take a full load of pans, a countertop that shrugs off a hot pan.
A compact galley at our Essential finish starts at $28,000 installed. A medium kitchen with room for a table is around $38,000, and most people spend a little more once they see a painted Shaker door or a quartz top next to the laminate. The estimator gives you a range in a minute; the survey fixes it.
Three to four weeks, and a kitchen you can use at night
Day one is demolition. By the end of the first week the new wiring, plumbing and drywall are in. Cabinets go in during week two, countertops are templated in place and installed a week later, then tile, finish work and a final clean. We set up a temporary sink and counter in a spare room or the laundry room, so you are never without a coffee maker.
Your appliances or ours
We can supply panel-ready appliances at trade price or install the ones you already own. Either way, we check the cutout sizes and the electrical load before a single cabinet is ordered.
Good for
- Tired kitchens with a layout that already works
- Adding an island where there is room for one
- Swapping laminate for quartz and painted doors
“The tile setter laid out the herringbone floor twice before he set a single tile. That is the level of care all the way through.”
Recent jobs like this
Other rooms we build
Open-concept kitchens
5 – 6 weeksTake out the wall, put in the beam and turn two rooms into one kitchen you actually eat in. Permits and inspections handled.
From $40,000 installed
Bathrooms
2 – 3 weeksHall and family bathrooms taken back to the studs and rebuilt: waterproofed, tiled and finished, with a toilet working every night.
From $16,000 installed
Primary baths and powder rooms
1½ – 2½ weeksSmall rooms, done properly: a shower that drains, a fan that clears the mirror, and storage you can reach.
From $12,000 installed